DP-EstimatorPRO · AI-Powered · V6.1 Engine
👁 VIEWER MODE — You are viewing a live estimate. All data is read-only. DP-EstimatorPRO
🤖
JARVIS
ESTIMATING INTELLIGENCE ENGINE — BURKES MECHANICAL INC.
● JARVIS ONLINE
Rules
0
Verified
0
Doug's Guide
0
Studied
0
Queue
0
💬 ASK JARVIS
Ask Jarvis anything about your estimate, MH rates, or project scope.
🔴 CONSOLE LOG
📚 STUDY / LEARN
📋 HOMEWORK QUEUE
📊 STUDY LOG
👁 OBSERVER ACTIVITY
🎓 TEACH JARVIS
RECENT KNOWLEDGE
Loading...
KNOWLEDGE BREAKDOWN
THREE-TIER KNOWLEDGE STACK
Project
Client
Bid #
Estimator
Total MH
0
Direct field hours
Direct Labor
$0
Field craft burdened
Indirect / Staff
$0
Supervision + mgmt
Materials
$0
From takeoff sheets
Equipment
$0
Equipment schedule
Per Diem
$0
Field allowances
📦 Subs
$0
0 packages w/ markup
◆ GRAND TOTAL
$0
All-in estimate
◈ MAN-HOURS BY DISCIPLINE
◈ COST BREAKDOWN BY DISCIPLINE
Discipline MH Labor Materials Total
🤖 AI PROPOSAL GENERATOR
Pulls all estimate data + uploaded scope documents → generates professional client proposal with scope, clarifications, exclusions & cost breakdown
PROPOSAL STYLE
ADDITIONAL NOTES
◈ ESTIMATE NOTES / ASSUMPTIONS
🏗 CIVIL ESTIMATE
CONCRETE · FORMWORK · FINISHES · REBAR · MASONRY · EARTHWORK · MATERIALS TAKEOFF · DEMO · FD GUIDE COMPARE · AI TAKEOFF
🪨 Concrete
🪵 Formwork
🪣 Finishes
🦾 Rebar & Embeds
🧱 Masonry/CMU
🌍 Earthwork
📦 BOM
🔢 Takeoff Detail
🔨 Demo
📊 Doug's Guide Compare
🤖 AI Takeoff
MH/CY rates from 2026 Bid Form · Concrete delivery price editable below
Concrete $/CY
DescriptionUOMQTYMH/UOM
editable
Total MHMat $/UOMMat Total
SUBTOTAL — CONCRETE0$0
Formwork MH/SF from 2026 Bid Form. Material cost auto-calculated at $3.50/SF (plywood + hardware) — editable per row.
DescriptionUOMQTYMH/UOMTotal MHMat $/UOMMat TotalForm Reuse
factor
SUBTOTAL — FORMWORK0$0
Finishing MH/SF from 2026 Bid Form. Enter area in SF for each finish type applied.
DescriptionUOMQTYMH/UOMTotal MH
SUBTOTAL — FINISHES0
Rebar MH/TON and anchor bolt rates from 2026 Bid Form. Enter tonnage from rebar takeoff or use AI estimate.
DescriptionUOMQTYMH/UOMTotal MHMat $/UOMMat Total
SUBTOTAL — REBAR/EMBEDS0$0
WORKFLOW: Drawings → AI extracts civil items here → review & edit quantities → Apply to Estimate → MH/cost auto-calculates
🪨 Concrete
🦾 Rebar & Embeds
🪵 Formwork
🧱 Masonry/CMU
🌍 Earthwork
⚙️ Misc Civil
Concrete pours by element type. CY quantities from drawings. PSI and supplier confirmed with project engineer.
# Element / Pour Description Type PSI UOM Qty Unit Cost Total Cost Supplier/Batch Plant Lead Time Notes
No items — run Drawing Analysis to auto-populate
CONCRETE TOTAL $0
Rebar by bar size, anchor bolts, embeds, wire mesh. Quantities in TON/EA/LB/SF from drawings.
# Description Size/Grade UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items
REBAR & EMBEDS TOTAL $0
Formwork materials — plywood, lumber, snap ties, form release. SF from drawings, materials auto-estimated.
# Description Form Type UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items
FORMWORK TOTAL $0
CMU block, brick, mortar, grout, ties. SF/LF/EA from drawings.
# Description Size UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items
MASONRY TOTAL $0
Excavation, backfill, compaction, sub-base materials. CY/TON from drawings and geotech.
# Description UOM Qty Unit Cost Total Cost Sub / Supplier Lead Time Notes
No items
EARTHWORK TOTAL $0
Finishes, sealers, joint sealants, drainage materials, misc civil items not covered above.
# Description UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items
MISC CIVIL TOTAL $0
Concrete: $0 Rebar/Embeds: $0 Formwork: $0 Masonry: $0 Earthwork: $0 CIVIL BOM TOTAL: $0
🦾 REBAR TAKEOFF — BY BAR SIZE
Enter LF per bar size. Weight = LF × lb/ft factor. Tie wire calculated at 0.004 lb per lb of rebar. Auto-totals to tons for labor bid.
Bar SizeDiamlb/LF Qty LF Total LBSTotal TONS $/TONMat CostNotes
REBAR TOTALS 0 0 $0
Est. Tie Wire: 0 lbs (0.004 lb/lb rebar) Tie Wire Cost @ $/lb: $0
🪨 CONCRETE VOLUME TAKEOFF — BY ELEMENT
Enter element dimensions to calculate CY. Waste factor added automatically (5% for slabs, 8% for walls/footings, 10% for piers/columns).
Element / PourType L (ft)W (ft)D (in) QTYWaste%Net CYGross CYPSIActions
TOTAL CONCRETE 0 CY 0 CY
🪵 FORM MATERIAL ESTIMATE
Approximate form materials from formwork SF quantities. Calculations based on standard plywood/lumber usage factors.
MaterialCalc BasisForm SF Used FactorQtyUOM $/UOMTotal Cost
FORM MATERIAL TOTAL $0
🧱 GROUT TAKEOFF & TYPE SELECTION
Application / LocationGrout Type L (in)W (in)D (in)QTY ea Vol CF$/CF (mat)Mat Cost MH/CFLabor MHActions
GROUT TOTALS 0 CF $0 0
Grout Types: Non-Shrink (Masterflow/Sika, $50/CF, 1.0 MH/CF) · Dry Pack (cement grout, $40/CF, 0.8 MH/CF) · Epoxy Grout ($180/CF, 1.8 MH/CF — use for vibrating/precision equip.) · Cement Wash ($25/CF, 1.0 MH/CF) · Self-Leveling NS ($55/CF, 0.5 MH/CF)
Demo and site work MH from 2026 Bid Form. Site layout = 0.25% of contract value (AL).
DescriptionUOMQTYMH/UOMTotal MHMat $/UOMMat Total
SUBTOTAL — DEMO/SITE0$0
📝 AI Takeoff
📊 Rate Comparison
💰 Cost Analysis
🤖 AI CIVIL TAKEOFF & SCOPE ANALYSIS

Describe scope, paste drawing notes or spec sections. AI estimates quantities, compares MH against 2026 Bid Form and Doug's Estimating Guide rates, then populates all civil tables.

Quick:
3-WAY MH COMPARISON2026 Bid Form rates vs. Doug's Estimating Guide rates vs. Variance. Red flag = >15% deviation. Data from authoritative estimating guide cross-referenced with Burkes 2026 bid form.
Work Item UOM BF 2026
MH/UOM
Doug's Guide
MH/UOM
Industry
Avg
Variance
BF vs FD
Flag Notes
Click "Rate Comparison" tab to load table
Doug's Guide = Doug's Estimating Guide (industrial construction baseline). Variance = (BF − FD) / FD × 100%. Green = within ±10%. Yellow = 10–20%. Red = >20%.
💰 CIVIL BID COST ANALYSIS
Civil Craft Rate $/hr
Total Civil MH
0
Labor Cost
$0
Material Cost
$0
Rebar Mat
$0
Concrete Mat
$0
CIVIL TOTAL
$0
Category MH % of Total MH Labor Cost Material Cost Subtotal MH/UOM (avg) vs Doug's Guide
Enter quantities in civil tabs, then click Refresh
CMU block, brick veneer, fireproofing — MH/SF. Doug's Guide rates shown for comparison.
DescriptionUOMQTY MH/UOM
editable
Doug's Guide
MH/UOM
Total MHMat $/UOMMat Total
SUBTOTAL — MASONRY/CMU0$0
Earthwork MH from Doug's Estimating Guide (Sec. 1000). Soil adj: Sand ×0.8 · Medium ×1.0 · Hard/Clay ×1.4 · Hardpan/Shale ×1.6.
Soil Factor
CategoryDescriptionUOMQTY MH/UOM
editable
Doug's Guide
MH/UOM
Total MHMat $/UOMMat Total
SUBTOTAL — EARTHWORK0$0
📊 DOUG'S GUIDE vs 2026 BID FORM — 3-WAY COMPARISON
Source: Doug's Estimating Guide (000-310-1000/1100) · Red = BF more than 15% above FD · Yellow = within 15% · Green = within 5%
Concrete: 0 Formwork: 0 Finishes: 0 Rebar: 0 Masonry: 0 Earthwork: 0 Demo: 0 Mat: $0 CIVIL TOTAL MH: 0
🔩 STRUCTURAL STEEL ESTIMATE
FIELD ERECTION · SHOP FABRICATION · SHIPPING
⚙ Field Installation
🏭 Shop Fabrication
📋 BOM / Material Order
📊 Detail Takeoff
FIELD ERECTION — MAN-HOURS ONLY — Same tonnage as Shop Fab, different rate table. No material cost here.
Quantities auto-populate from BOM. Erect-only: field tab only. Fab+erect: both tabs from same BOM.
Weight Class lbs/LF Range Tons MH/TON Total MH
Extra Heavy >90 lb/LF 0.0 0
Heavy 61–90 lb/LF 0.0 0
Medium 31–60 lb/LF 0.0 0
Light 10–30 lb/LF 0.0 0
Extra Light <10 lb/LF 0.0 0
Floor Plate plate stock 0.0 0
STEEL ERECTION SUBTOTAL 0.0 tons 0
▦ ACCESSORIES — FIELD INSTALL MH
ItemUOMQTYMH/UOMTotal MH
ACCESSORY SUBTOTAL 0
🏗 FIELD-ONLY ADJUSTMENTS (not in fab scope)
📐 Height Adjustment ×1.00
⚠ Complexity Adders
🔧 Field Allowances
Bolt-Up MH
Align/Plumb % of steel MH
Touch-Up Paint % of steel MH
Temp Bracing MH
Survey/Layout MH
Steel Erection Base MH 0
Accessory Install MH 0
Height Adjustment +0
Complexity Adders +0
Field Allowances +0
STRUCTURAL FIELD INSTALL TOTAL 0
🏭
SHOP FABRICATION COSTS ONLY — Material procurement + shop labor + overhead + finish + shipping.
No field erection or installation MH here. Field install MH lives entirely in the ⚙ Field Installation tab. Both tabs populate simultaneously from 📐 Drawing Analysis.
🕐 SHOP RATE MODE
OT adds +28.6% to all labor — use when schedule requires overtime to complete
Custom rate $/hr
📦 MATERIAL $/LB — BASE GRADES
A36 / A992 $/lb
SS 304 $/lb
SS 316 $/lb
Prices last updated: manual defaults
Click "Update All Material Prices" to fetch live rates
Weight Class lbs/LF range Weight (lbs) Grade Mat $/lb Labor $/lb (excl. finish) Material $ Labor+OH $ Total $ All-in $/ton
Extra Heavy >90 lb/LF $0 $0 $0
Heavy 61–90 lb/LF $0 $0 $0
Medium 31–60 lb/LF $0 $0 $0
Light 10–30 lb/LF $0 $0 $0
Extra Light <10 lb/LF $0 $0 $0
Floor Plate plate stock $0 $0 $0
STEEL SUBTOTAL 0 lbs 0.0 tons $0 $0 $0
▦ GRATING
TypeSFMat $/SFLabor $/SF (all-in)Material $Labor $Total $
Bar Grating — CS 1-1/4" bearing bar, 19-W-4, serrated · McNichols/industrial dist. 2025 $0 $0 $0
Bar Grating — SS 304 1-1/4" bearing bar, 19-W-4, serrated stainless $0 $0 $0
Expanded Metal — CS 3/4" #9 flattened HRPO carbon steel $0 $0 $0
Checker / Diamond Plate — CS 3/16" raised diamond plate A36 $0 $0 $0
GRATING SUBTOTAL $0 $0 $0
⚙ HANDRAIL & SAFETY SYSTEMS
TypeLFMat $/LFLabor $/LF (all-in)Material $Labor $Total $
Round Pipe HR — CS (1-1/2" Sch 40 pipe, posts & rails) $0 $0 $0
Round Pipe HR — CS w/ 1/4×4 FB Toe Plate (kick plate welded) $0 $0 $0
Round Pipe HR — SS 304 (1-1/2" Sch 40 SS pipe) $0 $0 $0
Square HSS HR — CS (1-1/2" sq HSS, posts & rails) $0 $0 $0
Square HSS HR — CS w/ 1/4×4 FB Toe Plate (kick plate welded) $0 $0 $0
Square HSS HR — SS 304 (1-1/2" sq HSS SS) $0 $0 $0
Safety Gates — CS (purchased pre-built) Fabenco / Kee Gate / GuardDog — OSHA compliant, self-closing · Material only, no fab labor — N/A —
pre-built
$0 $0 $0
HANDRAIL SUBTOTAL $0 $0 $0
🪜 STAIRS — SHOP FABRICATION
Stringer: shop fab by weight (lbs). Steps/Treads: shop fab unit cost per EA. Field install quantities entered separately in ⚙ Field Install tab (stringer by TON, steps by EA).
Component QTY / UOM Mat $/lb or $/EA Labor $/lb or $/EA (all-in) Material $ Labor $ Total $
Stair Stringer — CS Fabricated stringer assembly · priced by weight (lbs) lbs $0 $0 $0
Stair Stringer — SS 304 SS fabricated stringer · priced by weight (lbs) lbs $0 $0 $0
Stair Step / Tread — CS Bar Grating Fabricated grating tread with nosing · per EA EA $0 $0 $0
Stair Step / Tread — CS Diamond Plate Checker plate tread with nosing · per EA EA $0 $0 $0
Stair Step / Tread — SS 304 SS tread with nosing · per EA EA $0 $0 $0
STAIRS SUBTOTAL $0 $0 $0
ADD-ONS
Nelson Studs $/ea ×
🎨 FINISH
⚡ SHOP / FIELD SPLIT
% Field Fab %
All fabrication in shop
🚛 SHIPPING TO SITE
Ship lbs
÷ 40,000 lb/truck = 0 trucks
Miles to site
$/mile/truck
Shipping: $0
Shop MH
0
Shop Labor+OH
$0
Material
$0
Grating
$0
HR + Stairs
$0
Finish+Ship
$0
FAB SHOP TOTAL — ST Steel + Grating + Handrail + Finish + Shipping
$0
📋
BILL OF MATERIALS — SHOP PURCHASE ORDER
Generates from Drawing Analysis or enter manually. Print / copy to send out for material quotes. Shop fab & field install costs only — no erection labor here.
Project:
Date:
Prepared by:
Rev:
# Description / Member AISC Shape / Size Category Grade UOM QTY Unit Wt (lbs) Total Lbs Est. Cost Supplier Lead Time
No items yet — use 📐 Drawing Analysis to auto-generate, or click + Add Row
BOM TOTALS 0 lbs $0
💡 Tip: Estimated cost auto-calculates from unit weight × current A36/SS $/lb from the Shop Fab tab. Override any cell manually.
📊
DETAIL TAKEOFF — ESTIMATOR'S REVIEW SHEET
Every member from Drawing Analysis, grouped by AISC category. Scope items below. This is what the estimator reviews for accuracy. Export to Excel for purchasing / bid package.
Run 📐 Drawing Analysis first — the Detail Takeoff builds from extracted BOM data.
📁 DOC UPLOAD
SCOPE OF WORK REVIEW · DRAWING ANALYSIS · SUBCONTRACTOR PACKAGES
📋 Scope of Work
📌 Addenda & RFIs 🔒
📐 Drawing Analysis 🔒
📐
MULTI-DISCIPLINE AI DRAWING ANALYSIS
Upload drawings from any discipline (structural plans, isometrics, P&IDs, equipment lists). AI scans each file, identifies scope by discipline, extracts quantities, and auto-populates the correct estimate tab — Structural, Piping, or Mechanical — simultaneously.
Supports: PDF drawings, PNG/JPG scans · All values are editable after population
🔧
PIPING ISOs
Isometrics with BOM tables
AI reads image directly — fastest
🔩
STRUCTURAL
Steel plans, details, BOMs
Text extraction + AI vision
📋
P&IDs / GAs
Process diagrams, general arrangements
Multi-discipline reference drawings
📁
OTHER / MIXED
Mechanical, civil, specs, misc
Auto-detects discipline from content
📷
REFERENCE ONLY
Erection sequence, 3D models, photos
Skipped from BOM extraction
Jarvis uses for planning context
DISCIPLINES TO EXTRACT — SELECT ALL THAT APPLY
🔩 STRUCTURAL
🔧 PIPING
⚙️ MECHANICAL
🏗️ CIVIL / CONCRETE
📝 NOTES / OPTIONS
ESTIMATOR NOTES
No drawings loaded
📋
SCOPE OF WORK — STEP 1 OF 2
Upload the project Scope of Work or RFP. AI reads it and pulls every discrete scope item. You must review each item — marking it SCOPE, SUBCONTRACT, or EXCLUDE before Drawing Analysis unlocks. This tells AI exactly what Burkes is performing, subbing, and excluding.
Supports: PDF, DOCX, TXT — RFPs, bid packages, ITBs, project scopes, specs
🦙 LlamaParse active — connected to llamaparse-proxy.doug-cef.workers.dev
🦙 LLAMAPARSE PROXY:
LlamaParse requires a Cloudflare Worker proxy (free) to bypass CORS restrictions. Setup: 5 min — deploy the worker code from llamaparse-proxy-worker.js, paste URL above. Without it, PDFs use basic PDF.js text extraction (lower quality for tables/columns).
UPLOAD SCOPE DOCUMENTS
📂
Drop files here or click to browse
PDF, TXT, DOC — multiple files OK
SOW · RFP · Specs · ITB · Bid Package
PROJECT CONTEXT
Project
Client
Bid Date
Preparer
No document loaded
📌
ADDENDA & RFIs — SCOPE CHANGE MANAGEMENT
Drop addendum documents or RFI responses here. AI analyzes them against your current approved scope and flags what changed: NEW items, MODIFIED items, REMOVED items, or NO IMPACT. You review each change and accept or reject it.
Supports: PDF, DOCX, TXT — Addenda, RFI responses, spec revisions, ASIs
Current Scope: 0 items
Addenda Processed: 0
Pending Changes: 0
📎
Drop addendum or RFI files here
PDF, DOCX, TXT — each file analyzed against current scope
Upload addendum files to analyze
📌
Complete Scope Analysis First
Analyze and review your Scope of Work in the 📋 Scope of Work tab first.
Once your base scope is established, you can drop addenda here to track changes.
📦 SUB-CONTRACT WORK
SUBCONTRACTED SCOPE · AI-GENERATED SUB PACKAGES · READY TO SEND
📦
No Subcontract Scope Defined Yet
Upload a Scope of Work in the 📁 DOC Upload → Scope of Work tab,
check the items Burkes will subcontract, then click Generate Sub Packages.
💰 SUBCONTRACTOR PRICING
Enter sub quotes as received. Markup % pulls from Labor Rates → 3rd Party Markup (default 10%) — override per package below. Marked-up totals feed directly into the estimate grand total.
Sub Trade / Package Items Status Sub Quote $ Markup % Markup $ Total to Estimate Notes
No sub trades yet — complete the Scope of Work review to populate packages
SUBCONTRACTOR TOTALS $0 $0 $0
Totals auto-feed to Summary → Grand Total
🔍 SUB QUOTE ANALYZER AI-powered comparison + scope gap detection
Upload sub quotes (PDF) per trade. AI extracts pricing, line items, exclusions & qualifications, then cross-checks against your SOW scope items to flag gaps.
TRADE:
📄 Drop sub quote PDF here or click to upload
PDF files only — AI will extract and analyze
🔧 PIPING ESTIMATE
FIELD LABOR · CS FIELD · SS FIELD · SHOP FAB · TAKEOFF · WELDS · COST SHEET
⚙️ CS Field Install
🔩 SS Field Install
🏭 Shop Fab
📋 Takeoff Input
🔥 Field Welds
📦 BOM
💰 Cost Sheet
CS FIELD INSTALLATION LABOR · Enter Pipe LF, Field Welds, Valves, Bolt-ups, Supports for each size. MH rates from 2026 Bid Form.  RULE: 2" AND UNDER → ALWAYS FIELD RUN · NO SHOP FAB
SizeSch Pipe
MH/LF
Sup
MH/ea
Val
MH/ea
FW
MH/ea
B-up
MH/ea
Pipe LF Supports Valves Field Welds Bolt-ups Pipe MHSup MHVal MHFW MHBU MH Total MH
CS FIELD TOTAL 00 00 0 0
SS FIELD INSTALLATION LABOR · Stainless steel pipe up to 36". Higher MH rates reflect SS handling and fit-up requirements.  RULE: 2" AND UNDER → ALWAYS FIELD RUN · NO SHOP FAB
SizeSch Pipe
MH/LF
Sup
MH/ea
Val
MH/ea
FW
MH/ea
B-up
MH/ea
Pipe LF Supports Valves Field Welds Bolt-ups Pipe MHSup MHVal MHFW MHBU MH Total MH
SS FIELD TOTAL 00 00 0 0
PIPE TAKEOFF — Enter per ISO/line. Fitting allowances add to total length.   RULE: 2" AND UNDER → 100% FIELD WELDS · NO SHOP FAB
FIELD/SHOP WELD SPLIT (>2"): % FIELD / 40% SHOP
ISO#Line#Size"Mat'lSch Feet45°SR90°90°Tee ReducerO'letFlangeValve FWBolt-upSupportsTotal LFShop WeldsTotal Welds
TAKEOFF TOTALS 000 000 000 000 0 00
FIELD WELDS · Field weld MH is tracked here and in CS/SS Field tabs (via FW qty column). Use this tab for standalone weld count verification or manual entry.
Size"Mat'lSch Field Weld MH/eaQty Field WeldsTotal Weld MH
FIELD WELD TOTAL MH0
WORKFLOW: Drawings → AI extracts pipe items here → review & edit quantities → Apply to Estimate → MH/cost auto-calculates
Populated by drawing analysis. Edit qty/cost before applying.
📋 Field Pipe
🏭 Shop Fab Items
🔧 Valves & Inline
🔩 Bolts & Gaskets
🏗 Provided by Others
Pipe runs for field installation — CS and SS by size and schedule. Quantities in LF. AI-extracted from drawings.
# Description Size Mat'l Sch UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items — run Drawing Analysis to auto-populate, or click + Add Row
FIELD PIPE TOTAL $0
Fittings, flanges, weld-o-lets, nozzle stock for shop fabrication. Quantities in EA.
# Description Size Mat'l Rating UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items
SHOP ITEMS TOTAL $0
Valves, strainers, check valves, instrumentation connections. Quantities in EA.
# Description Size Type Rating UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items
VALVES & INLINE TOTAL $0
Stud bolts, nuts, gaskets, bolt sets for flanged connections. Auto-populated from takeoff bolt-up counts. Sorted by material spec and size.
# Description Size Mat'l Rating UOM Qty Unit Cost Total Cost Supplier Lead Time Notes
No items — push from Takeoff tab or click + Add Row
BOLTS & GASKETS TOTAL $0
FURNISHED / PROVIDED BY OTHERS — Client-furnished or owner-supplied piping items. Excluded from BOM cost; listed for field coordination.
#Item / DescriptionSizeQtySource (SOW Ref)Notes
No client-furnished piping items identified
Field Pipe: $0 Shop Items: $0 Valves/Inline: $0 Bolts/Gaskets: $0 PIPE BOM TOTAL: $0
CS Field MH: 0 SS Field MH: 0 Shop MH: 0 TOTAL PIPING MH: 0
🏭 PIPE SHOP FABRICATION
Shop Labor Rate $/hr
% Field Fab %
FIELD ITEMS NOT IN SHOP: Field welds, bolt-ups, and supports are entered in the CS Field / SS Field tabs only — no double-counting here. Shop fab covers: Butt Welds · Nozzles · Laterals · Reinforcement Pads · Socket Welds · Pipe Prep & Fit-up.
🔩 Weld Count
☢️ X-Ray / NDE
📋 Overhead & Cost
🤖 AI MH Lookup
Enter weld count per type for each pipe size. MH/ea rates scale from 2026 Bid Form butt-weld baseline × type multiplier. BW = butt weld · NZ-In = nozzle set-in · NZ-On = nozzle set-on · Lat = lateral/Y-branch · RPad = reinf. pad · SW = socket weld
Size BUTT WELD NOZZLE SET-IN NOZZLE SET-ON LATERAL REIN PAD SOCKET WLD Total
Shop MH
MH CS MH SS Qty CS Qty SS MH/ea Qty MH/ea Qty MH/ea Qty MH/ea Qty MH/ea Qty
SHOP TOTALS 0 0 0 0 0 0 0 MH subtotals 0
Total Shop Welds: 0
Total Shop MH: 0
BW Count: 0  |  Nozzle: 0  |  Lateral: 0  |  Repad: 0  |  Socket: 0
☢️ X-RAY / NDE CONFIGURATION
NDE Method
% of Welds to X-Ray
%
Cost per Shot ($)
Repair Rate (%)
%
X-RAY COST BREAKDOWN
Total Shop Welds 0
Welds to X-Ray 0
Repair Welds (est.) 0
NDE Method
Shots × $/shot
X-Ray Total Cost $0
↑ Enable X-Ray toggle to include NDE cost in shop total.
SHOP OVERHEAD
Forming / Repads ($)
Capping ($)
QC / DOCUMENTATION
QC ($)
Drawings ($)
Hydro ($)
PWHT ($)
MATERIALS
Pipe Material ($)
Plate Material ($)
Paint Material ($)
Painting Labor ($)
Other Material ($)
SHIPPING
Est. # of Loads
Freight ($)
Freight Total $0
🤖 AI SHOP WELD MH LOOKUP

Describe the weld type, pipe size, schedule, and material. AI will look up the MH estimate from the estimating guide and compare against current table values.

Shop MH
0
Labor
$0
Material
$0
X-Ray / NDE
$0
Other
$0
PIPE SHOP TOTAL Labor + Material + X-Ray + Overhead + Freight
$0
BASE LABOR
CS Field Install MH0
SS Field Install MH0
Base Field MH0
SHOP FABRICATION
Shop Fab MH0
Field/Shop Split %
FIELD LABOR ADDERS · % OF BASE FIELD MH
Material Handling % 0 MH
Hangers & Supports % 0 MH
Testing & Cleaning % 0 MH
Total Adders MH 0
TOTAL MAN-HOURS
Base Field MH0
Shop Fab MH0
Field Adders MH0
TOTAL PIPING MH0
COST ITEMS
✎ wage syncs to Labor Rate Builder · OT, burden, per diem, indirect managed there
Pipefitter Base Wage $ → Billing Rate $0/hr
Labor (MH × Billing Rate)$0
Pipe Material (BOM + Shop mat'l)$0
Shop Fab Cost (from Shop tab)$0
🚚 Pipe Shipping
loads × $
$0
PIPING TOTAL COST $0
0 MH
PIPING GRAND TOTAL Field + Adders + Shop
0 MH
⚙️ MECHANICAL EQUIPMENT SETTING
ROTATING · STATIONARY/VESSELS · HEAT EXCHANGERS · TANKS · SPECIALTY TASKS · DOUG'S GUIDE COMPARE
⚙ MECHANICAL TOTAL
Rotating: 0 MH Exchangers: 0 MH Tanks: 0 MH Specialty: 0 MH
0 Total MH $0
🔄 Rotating
♨️ Heat Exchangers
🛢 Tanks
🔧 Specialty Tasks
📊 Doug's Guide Compare
MH/unit from 2026 Bid Form (Mech Equip Setting Sheet). Blue badge = Doug's Guide reference · Green = within 5% · Amber = within 15% · Red = >15% deviation.
Equipment Type HP Range QTY MH/Unit DG ref Total MH Labor Cost
ROTATING SUBTOTAL0$0
MH by type and surface area (SF) or weight. Includes rig, set, head pulls, bundle slides, flange make-up, bolt torque. Doug's Guide Sec. 5400.
Equipment / Description Type Size / SF QTY MH/Unit DG ref Total MH Labor Cost Notes
HEAT EXCHANGERS SUBTOTAL0$0
API storage tanks, elevated tanks, day tanks, and small process tanks. MH/unit includes shell erection, roof, floor, nozzles, and appurtenances. Doug's Guide Sec. 5500.
Tank / Description Type Diameter (ft) Height (ft) QTY MH/Unit DG ref Total MH Labor Cost
TANKS SUBTOTAL0$0
Mechanical specialty tasks billed separately. Rates per Doug's Guide Sec. 5600 and Burkes Mechanical historical data. Enter quantity of each task performed.
Task UOM MH/Unit DG ref QTY Total MH Labor Cost Notes
SPECIALTY TASKS SUBTOTAL0$0
Compares current BM bid form MH vs Doug's Estimating Guide reference rates. Red = BF >15% above DG · Amber = within 15% · Green = within 5%.
🔥 WELD & CUTTING — C.S. PLATE
FILLET & BUTT WELDING BY PLATE THICKNESS · FLAME CUTTING
Flat Fillet
Vertical Fillet
Horizontal Fillet
Butt Weld
Flame Cut
ThicknessQTY (in)MH/inTotal MH
Flat Fillet MH0
ThicknessQTY (in)MH/inTotal MH
Vertical Fillet MH0
ThicknessQTY (in)MH/inTotal MH
Horizontal Fillet MH0
ThicknessQTY (in)MH/inTotal MH
Butt Weld MH0
ThicknessQTY (in)MH/inTotal MH
Flame Cut MH0
WELDING TOTAL MH: 0
👷 LABOR RATE BUILDER
T&M RATE SHEET GENERATOR — ENTER BASE CRAFT WAGE · SYSTEM CALCULATES ALL BILLING RATES
Rate Builder
Burden Workup
Burden Factors
3rd Party Markup
⚙ MASTER CRAFT RATE
Mechanical Craftsman Base: $ /hr
All rates scale proportionally · Override any individually below
💰 PER DIEM SETTINGS
Employee Pay: $ /day
Markup: %
BILL: $0.00 /day
Days Worked/Wk:
Hrs/Day:
PD: $0.00/hr
Craft / Position Base Wage $/hr
edit to change rates
S.T. Billing O.T. Billing D.T. Billing S.T. w/ P.D. O.T. w/ P.D. D.T. w/ P.D. Total Burden%
OT = hrs after 10 M-Th & all hrs Fri/Sat/Sun  ·  DT = holidays  ·  Formula: ST = Base x (1 + ST_burden + OH% + Profit%)  ·  OT = ST + (Base x 0.5) x (1 + OT_burden + Profit%)
FULL LINE-BY-LINE BURDEN WORKUP — $/HR PER CRAFT · BACKED INTO FROM BILLING RATES
Edit burden factors. Changes recalculate all billing rates immediately. Source: Burkes Mechanical Bid Form 2026 — Direct Labor sheet.
STRAIGHT TIME BURDEN FACTORS
Applied to 100% of base rate. Total ST factor = sum of all items below + Overhead + Profit.
OVERHEAD & PROFIT
Applied as % of BASE rate (not burdened rate). OH & Profit applied to ST portion only. Profit also applied to OT premium.
OT-ONLY BURDEN FACTORS
Applied only to OT premium (base x 0.5). WC, Safety & PPE, Small Tools NOT charged on OT. Overhead NOT charged on OT.
Markup % applied to 3rd party costs per Burkes Mechanical T&M rate sheet. Default: 10% per Burkes rate sheet. Adjust per project.
📦 MATERIALS
All materials purchased & sold to client
% markup
🏗 SUBCONTRACTORS
All subcontract work billed to client
% markup
🚜 RENTALS
All 3rd party equipment rentals
% markup
🔧 SPECIALTY ITEMS
Milling guns, honing rocks, specialty consumables
% markup
⚙ TOOLS ≥$1,000
AED rates + markup. Tools under $1K included in craft rate.
% markup
⚡ QUICK MARKUP CALCULATOR
Item Type:
Invoice Cost $:
INVOICE COST
$0.00
MARKUP $
$0.00
BILL TO CLIENT
$0.00
📋 SPECIAL BILLING ITEMS
ItemRateNotes
Code Stamp / A&I Sign-off$1,500 / occurrenceEach use of Burkes code stamp or authorized inspector review
Minimum Charge per Employee10 hrs minPer call-in / mobilization. Billed at applicable rate.
Late Payment Interest1.5% / monthAccounts past 30 days. Invoice terms: Net 30.
Emergency Call-In (Mon–Thu after hrs)OT + RolloverBilled from time employee leaves home until they return
Emergency Call-In (Fri–Sun daytime)OT RateAll hours at overtime rate
Emergency Call-In (Fri–Sun nighttime)DT RateAll hours at double time rate
Holidays (7 observed)DT RateNew Year's, Easter, July 4, Labor Day, Thanksgiving, Christmas Eve, Christmas Day
12-Hour DaysAll hrs incl. lunchNo unpaid lunch deduction on days ≥12 hrs
🚜 EQUIPMENT SCHEDULE
BURKES OWNED (NO MARKUP) · 3RD PARTY RENTAL (OH + PROFIT APPLIED) — RATES FROM BURKES EQUIP RATE SHEET
Equipment Qty Duration Unit Rate Subtotal Markup% Total
Use the buttons above to add Burkes-owned or 3rd party rental equipment lines.
BURKES OWNED
Subtotal $0
Markup
Burkes Total $0
3RD PARTY RENTAL
Equipment Cost $0
Delivery $
Pickup $
Rental Total $0
EQUIPMENT GRAND TOTAL $0
⚙ MANAGE RATE TABLES Upload new Burkes or 3rd party rates from CSV
🤖 AI-ASSISTED MH LOOKUP
FOR UNKNOWN SCOPES — POWERED BY CLAUDE · RESULTS EDITABLE WITH WARNING
🤖 CLAUDE ESTIMATING ASSISTANT
Describe the scope of work (e.g., "install 50 ton centrifugal pump 200HP", "erect 150LF of 4" stainless 10S piping with 12 90-degree elbows") to get an MH estimate cross-referenced against industry construction standards.
OVERRIDE LOG
No overrides recorded.
UNKNOWN SCOPE REGISTRY
ScopeAI Suggested MHEst. Applied MHΔStatusAdded By
No unknown scopes added yet. Use the AI lookup above.
📁 BID PIPELINE & ARCHIVE
BID TRACKING · WIN/LOSS · ESTIMATE ACCURACY OVER TIME
ACTIVE PIPELINE
0
Working + Submitted + Pending
WIN RATE
No decided bids yet
PIPELINE VALUE
$0
Total of active bids
DUE THIS WEEK
0
Loading pipeline...
ESTIMATE ACCURACY TRENDS
📅 PROJECT SCHEDULE & STAFFING
WORK CALENDAR · OT/DT RULES · FIELD SUPERVISION · OFFICE OVERHEAD
Work Calendar
Staffing Rules
Cost Rollup
PROJECT DATES
Start Date:
End Date:
Duration: — weeks
WORK SCHEDULE
Hrs/Day: hrs (OT after 10)
Days/Week: Mon–Fri (no OT)
OT / DT RULES
🕐 Straight Time: Mon–Thu ≤10 hrs/day
Overtime: Mon–Thu >10 hrs/day + all Fri/Sat/Sun hrs
🔴 Double Time: Holidays (7 Burkes observed)
Work week = Sun–Sat · Per diem charged on all calendar days worked (7-day if out-of-state)
HOLIDAYS IN PROJECT WINDOW
Enter start/end dates to see holidays in window
⚡ OUTAGE / SCHEDULE OVERRIDE PERIODS
Define date ranges where schedule changes (e.g., 7/12s during turnaround). These override the base schedule for those dates.
No outage periods defined. Base schedule applies to full project duration.
HOURS BREAKDOWN — PER EMPLOYEE
TOTAL CALENDAR DAYS
WORKING DAYS
ST HOURS
OT HOURS
DT HOURS (HOLIDAYS)
PER DIEM DAYS
COST PER EMPLOYEE — MECHANICAL CRAFTSMAN (EXAMPLE)
ST Labor Cost
$—
OT Labor Cost
$—
DT Labor Cost
$—
Per Diem (billed)
$—
TOTAL / EMPLOYEE
$—
Effective $/hr (all-in)
$—
Hrs/Wk auto-synced from Work Calendar. Edit any row to override manually.
📐 How headcount is calculated: Each discipline's takeoff MH is divided by the discipline's active weeks × hrs/week → workers needed. Set each discipline's start/end offset within the project, and the active hrs/week per worker. Override any headcount manually.
⚙ DIRECT LABOR — BY DISCIPLINE
MH pulled live from takeoff · Headcount = Discipline MH ÷ (Active Weeks × Hrs/Wk) · Override headcount manually if needed
Discipline Takeoff MH
from estimate
Start Offset
wks into project
End Offset
wks before end
Active Weeks
calculated
Hrs/Wk
per worker
Calc. HC
auto
Override HC
manual
Used HC Peak Workers
at any one time
DIRECT LABOR TOTAL 0 0 0
👷 FIELD SUPERVISION
Ratios auto-calculate headcount from direct labor. Override headcount manually if needed.
PositionRuleRatioCalculatedOverride QtyWeeksHrs/WkTotal MHTotal Cost
🏢 OFFICE & MANAGEMENT
Duration-based. Weeks auto-filled from project schedule. All values editable.
Position% of ProjectQtyWeeksHrs/WkTotal MHRate (ST)Total Cost
STAFFING SUMMARY
Field Supervision MH
0
Field Supervision Cost
$0
Office / Mgmt MH
0
Office / Mgmt Cost
$0
TOTAL STAFF MH
0
TOTAL STAFF COST
$0
Complete project cost rollup — Direct Labor (from takeoff MH × billing rates) + Indirect (supervision + management) + Per Diem + Equipment.
CategoryMHST CostOT CostDT CostPer DiemTotal
PROJECT TOTAL 0 $0 $0 $0 $0 $0
Direct labor OT/DT costs are based on project schedule. Indirect staff billed at ST rates for full project duration. Per diem = billed rate × calendar days × headcount.
🔍 MH SANITY CHECK
FLAGGED MH DEVIATIONS — USER INPUT vs BM TABLE VALUE vs CLAUDE AI LOOKUP · CLICK TO CHOOSE
Items appear here when a MH/UOM you enter differs ±20% from the BM table standard. Hit ▶ AI LOOKUP to get Claude's sanity check against industry data, then click which value to apply back to the estimate.
✅ No flagged deviations. All MH inputs are within ±20% of BM table values.
🖨 T&M RATE SHEET OUTPUT
PRINTABLE RATE SHEET — MATCHES BURKES FORMAT · POPULATED FROM RATE BUILDER
Client Name
Project Name
Effective Date
Materials/Subs/Rentals Markup
%
PIPING
ELECTRICAL
INSTRUMENTATION
MECHANICAL
STRUCTURAL
CRANE RENTAL
BURKES MECHANICAL & ELECTRICAL INC.
PHONE (205) 926-5847
FAX (205) 926-9984
#2 INDUSTRIAL ROAD
BRENT, AL. 35034
License No. 895350 | 221885
SAFETY     QUALITY     PRODUCTIVITY
LABOR RATES FOR TIME AND MATERIAL WORK
EFFECTIVE:
FOR:
PROJECT:
License No. 895350  |  221885
CRAFT STRAIGHT TIME OVERTIME DOUBLE TIME
Craftsman = electrician, pipe fitter, pipe welder, iron-worker, carpenter, or concrete finisher
Specialty Craftsman = instrument fitter, millwright, tank erector, crane operator, code welder, or boiler maker
PER DIEM — Per diem will be charged at $0.00 per day. Employees residing out-of-state will be paid per diem seven (7) days per week.
GENERAL NOTES & CONDITIONS
  1. This proposal is based on current labor, commodity, insurance, and statutory rates. Burkes Mechanical & Electrical Inc. reserves the right to obtain adjustments for any unforeseen cost increases or condition changes occurring after the date of this proposal.
  2. This proposal is contingent upon execution of a mutually agreeable contract.
  3. Overtime: Overtime applies to all hours worked in excess of ten (10) hours on Monday through Thursday, and to all hours worked on Friday, Saturday, and Sunday.
  4. Extended Shifts: Any employee working twelve (12) or more hours in a single day will be compensated for all hours worked, including the lunch period.
  5. Holidays: All work performed on observed holidays will be invoiced at the Double Time rate. Observed holidays are: New Year's Day, Easter, Independence Day (July 4), Labor Day, Thanksgiving Day, Christmas Eve, and Christmas Day. When a holiday falls on Friday, it will be observed on Thursday; when it falls on Saturday or Sunday, it will be observed on the following Monday.
  6. Tools & Safety Equipment: The above rates include all hand tools and personal safety equipment valued under $1,000.00. Any tool or equipment item valued at $1,000.00 or more will be billed at current AED rental rates.
  7. Training & Testing: Any training, certification, or testing required for the performance of work will be billed in accordance with this rate sheet.
  8. Emergency Call-In Rates:
    • After-hours call-in (Monday–Thursday): invoiced at the Overtime rate with rollover pay.
    • Day call-in (Friday–Sunday): invoiced at the Overtime rate.
    • Night call-in (Friday–Sunday): invoiced at the Double Time rate.
    • Call-in time is invoiced from the moment the employee departs their residence until they return home.
  9. Outage Rates: Rates stated herein apply to regular work periods. During major outage periods (defined as outages of three or more consecutive days), Outage Rates will apply. The outage rate period encompasses two (2) weeks prior to the outage, the weeks of the outage itself, and two (2) weeks following the outage.
  10. Code Stamp & QA/QC Work:
    • A fee of $1,000.00 per occurrence will be invoiced for each use of a Burkes code stamp.
    • QA/QC time includes both on-site hours and time required for associated office and documentation work.
    • A minimum charge of ten (10) hours per employee applies to all code-related work.
    • Specialty consumables (milling guns, honing rocks, grinding rocks, grinding burrs, flapper wheels, etc.) will be billed at cost plus 10%.
BILLING RATES — MATERIALS, SUBCONTRACTORS & EQUIPMENT
Materials: Cost + 10%
Subcontractors: Cost + 10%
Rentals: Cost + 10%
Equipment: Per current AED Equipment Rental Rate Schedule
TERMS & CONDITIONS: Invoices are due Net 30 Days from date of invoice. A finance charge of 1½% per month will be assessed on all balances outstanding beyond 30 days. We appreciate the opportunity to be of service.
Herbie Burkes, Jr.   President
License No. 895350  |  221885
CONFIDENTIALITY NOTICE
This document is intended solely for the addressee and contains confidential and/or privileged information and may be legally protected from disclosure. Information contained in this document may not be disseminated to other parties.
🚀 DEPLOY CENTER
GITHUB → VERCEL
Current: detecting…
QUICK DEPLOY
Triggers Vercel to rebuild from latest GitHub commit. Use after you've pushed code via git.
📤 PUSH CODE TO GITHUB
Drop updated files here to push directly to GitHub — no command prompt needed. Works from any device.
📁
Drop files here or click to browse
Accepts: index.html, bm-supabase.js
⚙ GitHub Token Configuration
DEPLOY WORKFLOW
Download the updated file from Claude (index.html)
Save to C:\Users\doug\OneDrive\Desktop\bm-deploy\
Push to GitHub — open cmd in bm-deploy folder, then run:
git add index.html bm-supabase.js
git commit -m "Session XX - description"
git push
Auto-deploys — Vercel picks up the push and deploys to dp-estimator.vercel.app (~30 seconds)
REPOSITORY
📄index.html(main app)
⚙️bm-supabase.js(Jarvis + cloud sync)
🐍api/extract.py(PDF extraction serverless)
⚙️vercel.json(routing config)
☁ CLOUD BACKUP + ROLLBACK
📈 EXECUTIVE DASHBOARD
OWNER / VP
BIDS THIS MONTH
0
estimates completed
PENDING
0
awaiting decision
WON
0
jobs awarded
WIN RATE
hit percentage
BID PIPELINE
Pipeline data will populate from Supabase as jobs are bid and tracked. Shows all estimators' work — who bid what, current status, dollar values, and dates.
ESTIMATOR ACTIVITY
Will show each estimator's recent activity: jobs bid this week, average estimate time, API costs per estimator, and current workload.
APP COST DASHBOARD
AVG COST / ESTIMATE
API + compute
TOTAL THIS MONTH
all users combined
COST PER TON
efficiency metric
👥 MY TEAM
PROJECT MANAGER
ASSIGNED ESTIMATORS
Team management will show estimators assigned to this PM. View their active jobs, review completed estimates, approve bids for submission.

This panel activates when Supabase Auth is connected and users are assigned to PM groups.
🧠
JARVIS CONTROL
GLOBAL KNOWLEDGE MANAGEMENT · OWNER ONLY
363 rules
Why this matters: Jarvis learns from every bid correction across all companies. Bad data from one client's estimator could corrupt knowledge used by everyone. This panel lets you review, approve, reject, or quarantine learned rules before they propagate.
TOTAL RULES
0
APPROVED
0
PENDING REVIEW
0
QUARANTINED
0
KNOWLEDGE ISOLATION PLAN
Current: All 363 rules live in one global Supabase table — shared across all companies.
Next: Add company_id column to jarvis_knowledge table. Rules with company_id = NULL are global (Doug's Guide, foundational rules). Company-specific corrections stay scoped to that company.
Result: Burkes' rules don't leak to Acme's estimates. Acme's corrections don't corrupt Burkes' knowledge. Doug's Guide stays universal.
💰
PLATFORM FINANCIALS
REVENUE · BILLING · SUBSCRIPTION MANAGEMENT
● ALL CURRENT
MRR
$0
ARR
$0
ACTIVE
0
TRIALS
0
PAST DUE
0
◈ REVENUE BREAKDOWN
Loading revenue data...
◈ ACCOUNTS click 💳 to edit
Loading...
◈ UPCOMING PAYMENTS (30 DAYS)
No payments scheduled
AVG REV / COMPANY
$0/mo
TOTAL COMPANIES
0
🏢 COMPANY MANAGEMENT
0
Toggle disciplines ON/OFF per client. They only see what you enable.
Loading companies...
🛡 ADMIN
PLATFORM OWNER
👥 USERS & ROLES
User management will show all platform users across all companies. Assign roles (owner/admin/pm/estimator/viewer), reset passwords, toggle active status.

This panel reads from app_users + Supabase Auth.
📊 API COST TRACKING
THIS MONTH
$0
Claude API spend
AVG PER ESTIMATE
tokens + compute
ESTIMATES RUN
0
this billing period
API cost tracking will pull from a api_usage table logging each Claude call with token counts and costs per company.
🔧 DEV TOOLS
Current: OWNER